Our Wadeville Works have 8 240 m2 of undercover fabrication, assembly and storage space which is equipped with a 50 t overhead crane, three 10 t overhead cranes and one 5 t overhead crane. These facilities allow for convenient handling of even the largest components.

 

Our facilities include the following:

  • Vertical and horizontal boring mills.
  • Vertical machining of items with a swing diameter of up to
    7.7 m and a height of up to 3.5 m.
  • Horizontal boring of items up to 11 m in length by 4 m in height.
  • Hydraulic assembling and testing facility.
  • Shot blast facility for large and small items.
  • Spray-painting facility.
  • Electrical production facility.
  • Electrical testing facility.
  • Lashing gear production and testing facility.
  • Lilly controller refurbishment facility.
  • Training facility.

© Winder Controls (Pty) Ltd 2015

LEGAL DISCLAIMERS